Thursday, 2 June 2016

Construction Design

The design stage involves four steps: programming and feasibility, schematic design, design development, and contract documents. It is the responsibility of the design team to ensure that the design meets all building codes and regulations. It is during the design stage that the bidding process takes place.

Conceptual/Programming and feasibility: The needs, goals, and objectives must be determined for the building. Decisions must be made on the building size, number of rooms, how the space will be used, and who will be using the space. This must all be considered to begin the actual designing of the building.

Building Design:
Building design refers to the broadly based architectural, engineering and technical applications to the design of buildings. All building projects require the services of a building designer, typically a licensed architect or structural engineer. Smaller, less complicated projects often do not require a licensed professional, and the design of such projects is often undertaken by building designers, draftspersons, interior designers (for interior fit-outs or renovations), or contractors. Larger, more complex building projects require the services of many professionals trained in specialist disciplines, usually coordinated by an architect.

Schematic design: Schematic designs are sketches used to identify spaces, shapes, and patterns. Materials, sizes, colors, and textures must be considered in the sketches.

Design development (DD): This step requires research and investigation into what materials and equipment will be used as well as their cost.

Contract documents (CDs): Contract documents are the final drawings and specifications of the construction project. They are used by contractors to determine their bid while builders use them for the construction process. Contract documents can also be called working drawings.


Building Foundation

The foundations of the building transfer the weight of the building to the ground. While 'foundation' is a general word, normally, every building has a number of individual foundations, commonly called footings. Usually each column of the building will have its own footing.

This capacity also modifies at different places of earth. generally, the deeper one digs, the most the safe bearing capacity, unless there are having weak soil in the place. To properly support a building, the soil must be very strong. It is common for the soil near the surface of the earth to be loose and weak. If a building is rested on this soil, it will sink into the earth like a ship in water. Building contractors will usually dig until they reach very firm, strong, soil that cannot be dug up easily before constructing a foundation.

The soil investigation team will then prepare a soil investigation report that lists the engineering properties of the soil at regular intervals, say every 2 meters. Based on this deport, engineers designing the structure can decide at what depth of soil to provide the foundations, the type of foundations they should provide, and the size of the foundations.

Every once in a while, engineers will find fill at a site. This occurs when humans have previously dug up the earth there, and then filled it back in. This happens if a quarry was dug or a building built there previously. Since fill is loose and soft and cannot support weight, engineers will dig to a depth below that of the fill, where strong soil is found, and construct foundations there.

Stages in Construction

Construction contains many stages to make proper building workout here are the main stages during the construction: The construction stage begins with a pre-construction meeting brought together by the superintendent. The pre-construction meeting is meant to make decisions dealing with work hours, material storage, quality control, and site access. The next step is to move everything onto the construction site and set it all up.

A Contractor progress payment schedule is a schedule of when (according to project milestones or specified dates) contractors and suppliers will be paid for the current progress of installed work.

Progress payments are partial payments for work completed during a portion, usually a month, during a construction period. Progress payments are made to general contractors, subcontractors, and suppliers as construction projects progress. Payments are typically made on a monthly basis but could be modified to meet certain milestones. Progress payments are an important part of contract administration for the contractor. Proper preparation of the information necessary for payment processing can help the contractor financially complete the project.

Once the owner moves into the building, a warranty period begins. This is to ensure that all materials, equipment, and quality meet the expectations of the owner that are included within the contract

What is Pre-Construction

The pre-construction stage begins when the owner gives a notice to proceed to the contractor that they have chosen through the bidding process. A notice to proceed is when the owner gives permission to the contractor to begin their work on the project. The first step is to assign the project team which includes the project manager (PM), contract administrator, superintendent, and field engineer.

Project manager: The project manager is in charge of the project team.

Contract administrator: The contract administrator assists the project manager as well as the superintendent with the details of the construction contract. 

Superintendent: It is the superintendent's job to make sure everything is on schedule including flow of materials, deliveries, and equipment. They are also in charge of coordinating on-site construction activities. 

Field engineer: A field engineer is considered an entry-level position and is responsible for paperwork. 

During the pre-construction stage, a site investigation must take place. A site investigation takes place to discover if any steps need to be implemented on the job site. This is in order to get the site ready before the actual construction begins. This also includes any unforeseen conditions such as historical artifacts or environment problems. A soil test must be done to determine if the soil is in good condition to be built upon.

The construction stage begins with a pre-construction meeting brought together by the superintendent. The pre-construction meeting is meant to make decisions dealing with work hours, material storage, quality control, and site access. The next step is to move everything onto the construction site and set it all up.

Types of Construction

• Agricultural: Typically economical buildings, and other improvements, for agricultural purposes. Examples include barns, equipment and animal sheds, specialized fencing, storage silos and elevators, and water supply and drains such as wells, tanks, and ditches.

• Residential: Residential construction includes houses, apartments, townhouses, and other smaller, low-rise housing types 

• Commercial: This refers to construction for the needs of private commerce, trade, and services. Examples include office buildings, "big box" stores, shopping centers and malls, warehouses, banks, theaters, casinos, resorts, golf courses, and larger residential structures such as high-rise hotels and condominiums.

• Institutional: This category is for the needs of government and other public organizations. Examples include schools, fire and police stations, libraries, museums, dormitories, research buildings, hospitals, transportation terminals, some military facilities, and governmental buildings. 

• Industrial: Buildings and other constructed items used for storage and product production, including chemical and power plants, steel mills, oil refineries and platforms, manufacturing plants, pipelines, and seaports.

• Heavy civil: The construction of transportation infrastructure such as roads, bridges, railroads, tunnels, airports, and fortified military facilities Dams are also included, but most other water-related infrastructure is considered environmental. 

• Environmental: Environmental construction was part of heavy civil, but is now separate, dealing with projects that improve the environment. Some examples are water and wastewater treatment plants, sanitary and storm sewers, solid waste management, and air pollution control

Construction Management

Construction Project Management (CPM) is the overall planning, coordination, and control of a project from beginning to completion. CPM is aimed at meeting a client's requirement in order to produce a functionally and financially viable project. 

The functions of construction management typically include the following: The Construction Management Association of America (a US construction management certification and advocacy body) says the 120 most common responsibilities of a Construction Manager fall into the following 7 categories: Project Management Planning, Cost Management, Time Management, Quality Management, Contract Administration, Safety Management, and CM Professional Practice. CM professional practice includes specific activities, such as defining the responsibilities and management structure of the project management team, organizing and leading by implementing project controls, defining roles and responsibilities, developing communication protocols, and identifying elements of project design and construction likely to give rise to disputes and claims.

The construction industry is composed of five sectors: residential, commercial, heavy civil, industrial, and environmental. A construction manager holds the same responsibilities and completes the same processes in each sector. All that separates a construction manager in one sector from one in another is the knowledge of the construction site. This may include different types of equipment, materials, subcontractors, and possibly locations.


Specifying project objectives and plans including delineation of scope, budgeting, scheduling, setting performance requirements, and selecting project participants. Maximizing the resource efficiency through procurement of labor, materials and equipment. Implementing various operations through proper coordination and control of planning, design, estimating, contracting and construction in the entire process. Developing effective communications and mechanisms for resolving conflicts.